Calculate how many cubic yards and pre-mixed bags of concrete you need for slabs, patios, footings, and sidewalks.
Standard residential 4-inch slab estimate including 10% subgrade and spill buffer:
| Slab Project | Area | Cubic Yards | 80 lb Bags | 60 lb Bags |
|---|---|---|---|---|
| 4' x 4' AC / Shed Pad | 16 sq ft | 0.20 yd³ | 10 bags | 13 bags |
| 8' x 10' Small Patio | 80 sq ft | 1.00 yd³ | 49 bags | 65 bags |
| 10' x 10' Shed Slab | 100 sq ft | 1.23 yd³ | 61 bags | 82 bags |
| 10' x 20' Driveway Section | 200 sq ft | 2.47 yd³ | 122 bags | 163 bags |
| 12' x 24' 1-Car Garage Slab | 288 sq ft | 3.56 yd³ | 176 bags | 234 bags |
There are 45 bags of 80 lb concrete in one cubic yard (27 cubic feet / 0.60 cu ft per bag = 45 bags).
Standard residential walkways, patios, and shed slabs are poured 4 inches thick (using 2x4 lumber for formwork). For heavy pickup trucks or RV pads, a 5-inch or 6-inch reinforced pour with rebar is recommended.
Subgrades and gravel bases are rarely perfectly level. Subgrade depressions, spills, and form deflection routinely consume 8% to 10% more volume than theoretical math estimates.